Church Creek Project
In 2015 WSDOT proposed a new 3 sided precast culvert with the sole intent of improving existing and future fish passageways. This new design increased the previous 30 foot [...]
In 2015 WSDOT proposed a new 3 sided precast culvert with the sole intent of improving existing and future fish passageways. This new design increased the previous 30 foot [...]
Although they may have the same types of precast elements, every stadium has a unique set of casting requirements. Often an in depth analysis of all the variations is [...]
This vertical match cast tower project was unique in that not only did it have a constantly changing profile, but there was also a transition a portion of the [...]